Unclaimed brand
The Komati Basin Water Authority (KOBWA) is a bi-national entity formed in 1993 through the Treaty on the Development and Utilization of the Water Resources of the KOMATI River Basin which was signed in 1992. The agreement was between the Kingdom of Eswatini and the Republic of South Africa The Purpose of KOBWA was to implement Phase 1 of the Komati River Basin Development Project. Phase 1 comprises; the design, construction, operation and maintenance of the Driekoppies Dam in South Africa (Phase 1a) and the Maguga Dam in Eswatin (Phase 1b). The construction of Maguga Dam marked the end of phase 1 of the Komati River Basin Development Project.
Liking this brand profile? Share this page


Hex Code
Color name
RGB
HSL
CMYK
#01319D
Smalt
1, 49, 157
222, 99, 31
99, 69, 0, 38
#FFFFFF
White
255, 255, 255
0, 0, 100
0, 0, 0, 0
#040071
Navy Blue
4, 0, 113
242, 100, 22
96, 100, 0, 56
The Komati Basin Water Authority (KOBWA) is a bi-national entity formed in 1993, dedicated to the development and utilization of the water resources of the KOMATI River Basin. The authority was established through a treaty signed between the Kingdom of Eswatini and the Republic of South Africa. KOBWA's main focus was to implement Phase 1 of the Komati River Basin Development Project, which included the design, construction, operation, and maintenance of the Driekoppies Dam in South Africa (Phase 1a) and the Maguga Dam in Eswatini (Phase 1b). The construction of the Maguga Dam marked the completion of phase 1 of the project.
Currently, KOBWA is committed to the operation and maintenance of the dams and related infrastructure. The authority consists of four main departments: Water Management, Corporate, Finance, and Administration. These departments ensure the smooth functioning of the organization in terms of system operation, finance control, human resource support, and daily operations.
The Komati River Basin is a vital water source for South Africa, Eswatini, and Mozambique. The development plan for the basin aims to cater to the increasing water demands of these countries. Phase 1 of the project included the construction of the Driekoppies Dam and the Maguga Dam. The establishment of the Joint Water Commission (JWC) and the bi-national Komati Basin Water Authority (KOBWA) facilitated the implementation and sharing of resources for the project.
Overall, the Komati Basin Water Authority plays a crucial role in managing and preserving the water resources of the Komati River Basin for the benefit of the participating nations.
How do I download the Komati Basin Water Authority logo?
The Komati Basin Water Authority logo comes in two versions: a logo and an icon. Download as transparent PNG or JPEG.
What are Komati Basin Water Authority's brand colors?
The Komati Basin Water Authority color palette uses the hex codes #01319D, #FFFFFF and #040071.
The Komati Basin Water Authority name, logos and brand assets are trademarks of Komati Basin Water Authority and its affiliates. Brandfetch isn't affiliated with or endorsed by Komati Basin Water Authority. Their use is subject to Komati Basin Water Authority's brand guidelines.